Call 01565 777234 for assistance
-
-
Home
About Us
Book Store
Our Customers
Research Services
News
Links
Contact Us
Search
Quick Links:
Advanced Search
|
Special Offers
|
Free Downloads
|
Terms & Conditions
Architecture
British Standards
Building and Engineering Contracts
Building Process
Building Services
Business and Management
Civil Engineering
Computing
Construction Industry
Construction Management
Construction Skills
Course Books
Dispute Resolution
Energy
Engineering
English Law
Environment
Health and Safety
Law of Other Countries
Planning
Procurement
Property
Quantity Surveying
Reference Books
Stationery Office Documents
Surveying
Transport
Utilities
Special Offers
New Products
Free Downloads
Terms & Conditions
Home
»
Building and Engineering Contracts
»
Building Contract Claims
Quantifying and Managing Disruption Claims
[22591]
£50.00
Claims involving disruption are commonly accepted to be the most difficult to quantify. Disruptions that occur during a working day can lead to productivity loss which, in turn, can lead to time and cost overruns. If the disruption consumes the entire float in an activity, then disruption can cause a delay to project completion and lead to claims for extensions of time. Contractors of all tiers, concerned that they have lost money, troubled by the threat of liquidated damages or simply because the conditions of contract allow, submit claims for loss/expense and (in the worst case scenarios) extensions of time. The accurate quantification of the time and cost effects of such disruption is typically prevented because the role of labour/resource productivity is not fully recognised, site labour productivity is not correctly measured (if at all) and, finally, because the relationship between, in practice, the bill of quantities items (cost) and programme activities (time) is not direct or transparent. The solution proposed in this book integrates cost and time in order to develop a site labour productivity measurement system whereby claims involving disruption can be objectively and automatically quantified. It is a practical text that challenges the current construction industry cost and time estimating methods, demystifies the measurement of site labour/resource productivity and – in line with the Society of Construction Law Delay and Disruption Protocol launched in October 2002 – puts forward a rational and sufficiently accurate method of quantifying the effects of disruption in terms of both cost and time. Through the use of the solution on four very different demonstration construction projects, this book provides worked examples and tangible evidence of how the solution is designed to operate in practice. Disruption claims often impact on the whole of the construction industry and so this book has been specifically written for anyone who is involved in submitting, evaluating, awarding, managing and resolving disruption claims.
Author:
Lal, Hamish
Date Published:
December 2002
Document Type:
Books
Format:
Hard Back
ISBN:
0727731653
ISBN13:
9780727731654
Pages:
307
Publisher:
Thomas Telford
Quantity:
Customers who bought this product also purchased
JCT Design and Build Contract 2005, 3rd edition
Delay Analysis in Construction
0 items
JCT 2005 CWa/F- Contractor Collateral Warranty for a Funder
£10.50
£9.45
JCT Design and Build Contract 2005, 3rd edition
£59.50