Call 01565 777234 for assistance
-
-
Home
About Us
Book Store
Our Customers
Research Services
News
Links
Contact Us
Search
Quick Links:
Advanced Search
|
Special Offers
|
Free Downloads
|
Terms & Conditions
Architecture
British Standards
Building and Engineering Contracts
Building Process
Building Services
Business and Management
Civil Engineering
Computing
Construction Industry
Construction Management
Construction Skills
Course Books
Dispute Resolution
Energy
Engineering
English Law
Environment
Health and Safety
Law of Other Countries
Planning
Procurement
Property
Quantity Surveying
Reference Books
Stationery Office Documents
Surveying
Transport
Utilities
Special Offers
New Products
Free Downloads
Terms & Conditions
Home
»
Property
Total Office Costs Survey 2008 (TOCS), 11th edition
[198063]
£299.00
The Total Office Cost Survey is an annual survey conducted by Actium Consult with the data captured from a wide range of facilities services providers. It validates the latest office occupancy cost data against cost definitions, allowing users to measure the real cost of office occupation and enable effective comparison. So what does TOCS include? Provides full costs for new office buildings in 50 UK locations. Net Effective Rents and rent free periods being granted to new tenants in 50 locations. This data is the result of structured interviews with over 100 agents throughout the UK. Full costs analysis per line (per sq m) of rent, rates, fit out, furniture, insurance, maintenance, moves, reinstatement, security, cleaning, utlities, energy, telephone, catering, reception, post, reprographics and management. A practical guide on how to use TOCS to measure the real total costs of office occupation, to inform location and procurement decisions, and to facilitate cost reduction initiatives. TOCS methodology and assumptions (eg TOCS is based on a 500 sq m office building). Key Findings from the Survey. Components of total office costs and cost distribution analysis. Full details of definitions which are output based and are modelled with the help of our suppliers. Costed business case comparison for flexible working. Green definitions for office buidlings.
Author:
Proctor, Andrew|Fennell, Bill
Date Published:
April 2008
Document Type:
Books
Format:
Paperback
ISBN:
198063
ISBN13:
198063
Publisher:
Actium Consult
Quantity:
0 items
JCT 2005 MTC- Measured Term Contract Revision 1
£24.50
£22.05
Renewable Energy in Power Systems
£45.00