Call 01565 777234 for assistance
-
-
Home
About Us
Book Store
Our Customers
Research Services
News
Links
Contact Us
Search
Quick Links:
Advanced Search
|
Special Offers
|
Free Downloads
|
Terms & Conditions
Adjudication Cases
Alternative Dispute Resolution (ADR)
Arbitration
Architecture
Building Conservation and Refurbishment
Building Contract Books
Building Control
Building Costs
Building Defects
Building Information Modelling (BIM)
Building Maintenance
Building Materials
Building Regulations
Building Services
Building Technology
Business and Management
Case Law Library
Chemical Engineering
Civil Engineering
Commercial Management
Construction (Design and Management) CDM Regulations
Construction Industry
Construction Law
Construction Management
Construction Skills
Construction Technology
Contaminated Land
Contract Shop
Dispute Resolution
Domestic Building
Energy
Energy Management
Engineering
English Law
Environment
Estimating
Expert Determination
Expert Witness
Facilities Management
Fire Protection
Health and Safety
Highways and Traffic Engineering
Insurance
Joint Ventures
Journal Articles
Landscape Architecture
Law
Nuclear Engineering
Partnering
Price Books
Private Finance Initiative (PFI)
Process Plant Construction
Procurement
Project Finance
Project Management
Property
Public Private Partnerships (PPP)
Public Procurement
Quantity Surveying
Reference Books
Residential Construction
Risk Management
Site Management
Site Productivity
Surveying
Sustainable Construction
Tendering
Transport
Waste Management
Whole Life Costs
Special Offers
New Products
Free Downloads
Terms & Conditions
Home
»
Procurement
Early Contractor Involvement in Building Procurement: Contracts, Partnering and Project Management
[252743]
£62.99
£59.84
Can contractors and specialists add value to a project by their early involvement in design, pricing, risk management and programming? How can this be structured and what role do contracts have to play? What is the impact on procurement and project management?
Commentators from Banwell to Egan have recommended earlier contractor appointments, and this has also been linked to successful project partnering. How are the two related? Early Contractor Involvement in Building Procurement considers the case for a two stage procurement approach based on a system of agreed project processes during the preconstruction phase. It examines the ways in which a contract can describe and support this model throughout its procurement, partnering and project management, and is illustrated with case studies taken from projects and programmes across the construction and engineering industry.
The roles of the various parties involved, the obstacles they encounter and the benefits they can achieve are examined in detail. There is practical guidance on how to improve speed, economy, sustainability, change control, dispute avoidance, and client satisfaction. This book bridges the gap between contract law, partnering and project management and will be essential reading for middle and senior management at construction contractors, consultants and clients in both the public and private sectors.
Contents:
Chapter 1 Early Contractor Involvement - An Overview; 1.1 Early contractor involvement - why bother?
1.2 Early contractor involvement and project pricing; 1.3 Early contractor involvement and risk transfer; 1.4 Early contractor involvement and payment; 1.5 The role of building contracts; 1.6 The limits of construction phase building contracts; 1.7 Contractor contributions to design, pricing and risk management; 1.8 The client, communications and project programmes; 1.9 But do you need an early building contract?
1.10 Preconstruction commitments under framework agreements; 1.11 The influence of project managers and project partnering; 1.12 So what is stopping us?
1.13 Government and industry support; Chapter 2 Conditional Contracts and Early Project Processes; 2.1 The conditional preconstruction phase agreement; 2.2 Recognised categories of contract; 2.3 Effect of the number of parties; 2.4 The planning function of contracts; 2.5 Choices and contractual conditionality; 2.6 Limited efficiency caused by unknown items; 2.7 Risk and fear of opportunism; 2.8 Conditional relationships without full consideration; 2.9 Need for long-term relations; 2.10 Alignment of different interests; 2.11 Preconstruction phase agreements as project management tools; 2.12 Contracts and new procurement systems; Chapter 3 Problems and Disputes Under Construction
Building Contracts; 3.1 Introduction; 3.2 The role of standard form building contracts; 3.3 Standard forms and the assumption of complete
information; 3.4 Origins of standard forms and lack of trust; 3.5 Criticisms of effectiveness of standard forms; 3.6 Causes of claims; 3.7 Links between claims and preconstruction phase
activities; 3.8 Links between claims and building contracts; 3.9 New procurement procedures or gambling on incomplete information; Chapter 4 Early Contractor Involvement in Design,
Pricing and Risk Management; 4.1 Introduction; 4.2 Preconstruction design processes; 4.3 Preconstruction pricing processes; 4.4 Preconstruction risk management processes; 4.5 Preconstruction subcontractor appointments; 4.6 Perceived benefits of early contractor appointments; 4.7 Early contractor appointments and sustainability; Chapter 5 Client Leadership, Communication Systems
and Binding Programmes; 5.1 Introduction; 5.2 The role of the client; 5.3 The role of communication systems; 5.4 The role of binding programmes; Chapter 6 Contractual and Non-contractual
Preconstruction Options; 6.1 Introduction; 6.2 Building contract options; 6.3 Letters of intent; 6.4 Non-binding arrangements; 6.5 Benefits of contractual clarity; Chapter 7 Preconstruction Commitments Under
Framework Agreements; 7.1 Commercial attraction of frameworks; 7.2 The relationship between frameworks and
partnering; 7.3 Frameworks and preconstruction phase processes; 7.4 Published forms of framework agreement; 7.5 Frameworks and the Private Finance Initiative; 7.6 The impact of frameworks on changing behaviour; Chapter 8 Project Management and Project Partnering; 8.1 Introduction; 8.2 Preconstruction phase agreements and project management; 8.3 Preconstruction phase agreements and partnering; Chapter 9 Obstacles to Early Contractor Appointments; 9.1 Introduction; 9.2 Project-specific obstacles; 9.3 Procedural obstacles; 9.4 Personal obstacles; 9.5 Education and training; 9.6 The role of the partnering adviser; Chapter 10 Government and Industry Views and Experience; 10.1 Introduction; 10.2 Importance of government and construction
industry support; 10.3 Support for contractor and subcontractor design contributions; 10.4 Support for two-stage pricing; 10.5 Support for selecting contractors by value; 10.6 Support for joint risk management; 10.7 Support for greater client involvement; 10.8 Government and industry views on partnering; 10.9 Government views on preconstruction phase agreements; 10.10 Industry experience of preconstruction phase agreements; 10.11 Preconstruction phase agreements in an economic downturn; Chapter 11 Conclusions - the Golden Age Of Rock 'n' Roll?
11.1 Functions of building contracts and their potential to govern project processes; 11.2 The assumption in standard form building contracts of complete project information and consequent problems and disputes; 11.3 Preconstruction phase processes that can be improved by early contractor appointments; 11.4 The role of the client, communication and programming of preconstruction phase processes; 11.5 Contractual and non-contractual options to govern preconstruction phase processes; 11.6 Increased preconstruction commitments under framework agreements; 11.7 The relationship of preconstruction phase agreements to project management and partnering; 11.8 Circumstances and attitudes that are obstacles to early contractor appointments or to preconstruction phase agreements; 11.9 Government and industry support for early contractor appointments under preconstruction phase agreements; Appendix A Project Case Studies; Use of Preconstruction Phase Agreements on Single Projects; Use of Preconstruction Phase Agreements on Multiproject Frameworks; Appendix B Preconstruction Phase Processes Under Standard Form Building Contracts; 1 Introduction; 2 Design development; 3 Two-stage pricing; 4 Risk management; 5 Communications; 6 Programmes; 7 Team integration; Appendix C Preconstruction Phase Processes Under Standard Form Framework Agreements; Introduction; JCT Framework Agreements; NEC3 Framework Contract; Appendix D Form of Risk Register; Appendix E Form of Partnering Timetable; Appendix F Association of Partnering Advisers Code of Conduct; Appendix G Bibliography; Part 1 Contract forms; Part 2 Articles and books; Part 3 Government/industry reports; Part 4 Table of cases; Index.
YOU CAN READ AN EXTRACT FROM THIS BOOK BY CLICKING ON THE "MORE INFORMATION" LINK.
Author:
Mosey, David
Date Published:
July 2009
Document Type:
Books
Format:
Hardback
ISBN:
1405196459
ISBN13:
9781405196451
Pages:
328
Publisher:
Wiley-Blackwell
Quantity:
Customers who bought this product also purchased
Infrastructure for the Built Environment: Global Procurement Strategies
Code of Estimating Practice, 7th edition
Beware the Dark Arts! Delay Analysis and the Problems with Reliance on Technology A paper presented to the SCL International Conference held in London, 6th-7th October 2008
Piling engineering, 3rd revised edition
0 items
Guide to DB 05
£42.00
£39.90
Renewable Energy in Power Systems
£45.00